TA9A Blue Energy
Request a briefing
TA9A Blue Energy · Morocco

What if the sea itself could power coastal communities?

TA9A Shark is a near-shore wave and tidal machine for ports and fishing cooperatives that pay for diesel today.

StatusModelled. Not yet measured at sea.
TA9A Shark CAD render
Drag to rotate
Fig. 1 · TA9A Shark · CAD model
Origin
I grew up 200 metres from the sea, and every summer the power still went out. That question became TA9A.
Yassir Aoulad Ben Ali, founder and CTO
TA9A is “taqa”, power, written the way Moroccans write it online.
Concept illustration
Sheet 01The gap

Morocco has the coast. The mix has no marine column.

About 3,500 km of coastline. 4,851 MW of renewables at the end of 2025, and no marine capacity listed.

Wind
2,452 MW
Hydropower
1,306 MW
SolarPV 546 · CSP 540
1,086 MW
Bioenergy
7 MW
Marine
No capacity listed
Renewable capacity, end 2025 · 4,851 MW · 39.6% of installed capacity

Off-grid ports and fishing cooperatives along the coast still pay for diesel. That is our customer, and our competitor.

3,500km

of coastline, about 3,000 km on the Atlantic

30kW/m

average wave power at the best sites on the central Atlantic coast

The resource is there. That study measures up to 262 MWh per metre a year, and it is more than four times stronger in winter than in summer.

It covers the Atlantic only. Our model uses Mediterranean sea states, so the pilot has to measure the real site.

Concept illustration

Sources: IRENA Renewable Capacity Statistics 2026, via Energetica India (11 Apr 2026). Coastline: Policy Center for the New South (2022). Wave study: Sierra, Martín, Mösso, Mestres, Jebbad, Renewable Energy 96(A), 2016.

Sheet 02The machine

One frame captures waves and tide.

TA9A Shark pairs a wave mechanism and a tidal turbine in one near-shore unit.

TA9A Shark CAD render with callouts 1 and 2 12
Fig. 2 · CAD rendering, not an as-built photograph
01Surface waves

A float drives the Scotch & Yoke mechanism.

02Tidal current

A submerged Gorlov rotor takes energy from moving water.

  • About 10 kW average, modelled
  • Near shore, sized for a port or a fishing cooperative
  • Sealed generator housings
  • Rectifier, MPPT and LiFePO4 buffer, with telemetry to shore (design)
  • Bench MVP built. The 13 m prototype is the next build.

Three iterations: ECOTIDETECH (first concept), the hybrid bench MVP, and TA9A Shark.

Deployment simulation · 0:40
Array layout · 0:25
Simulations show design intent. They are not sea trials.
Concept illustration · Indicative system layout. Cable route, seabed works and authorisations are site-specific.

From the sea to the shore

01
At seaAnchor the unit at a surveyed site.
02
Cable to shoreRoute the cable to the quay.
03
At the quayPower conversion and protection connect to the customer’s load.
04
To the loadIn this concept: battery storage and a cooperative’s cold store.
Sheet 03The numbers

The model says 10 kW on average.

Everything else follows from that one number. It is an annual average, so real output will move with the sea.

Input · average output
10kW
per unit, from our model
× 8,760 hours
Energy · per year
87.6MWh
of electricity a year
× €0.50 per kWh
Diesel displaced · per year
€43,800
of avoided diesel
StatusModelled. Not yet measured at sea. Measuring it is what the funding round pays for.

Simple payback on a €14,000 unit (proposed)

Average outputDiesel avoided a yearPayback
10 kWmodelled87.6 MWh · €43,8003.8 months
7.5 kWscenario65.7 MWh · €32,8505.1 months
5 kWscenario43.8 MWh · €21,9007.7 months

Before installation, service, finance and taxes. Assumes all output displaces diesel at €0.50 per kWh.

Same machine, four prices of electricity

Illustrative scenarioAvoided cost per kWhPayback
Morocco · off-grid diesel€0.5003.8 months
Italy · industrial€0.2477.8 months
Spain · ports€0.190-0.2009.6-10.1 months
Morocco · grid connected€0.09719.8 months

Tariffs are assumptions for comparison, with 87.6 MWh a year and a €14,000 unit in every row. Each customer needs a site quote.

Two ways to buy

Buy the unit

You own the machine. Proposed price €14,000.

Buy the electricity

We own and maintain the machine and you pay for the electricity. Service tariffs are not agreed yet.

Impact, stated carefully

About 61 t of CO₂ avoided a year per unit, if it displaces diesel (0.7 kg per kWh, modelled). Effects on cold storage and cooperative income are unmeasured. The pilots will measure them.

What it costs to build

Bench MVP
€1,840
Reported build cost
13 m prototype
€13,800
One-off build estimate
Serial, 50+ units
€9,200
Target, pending the final bill of materials. About 34% gross margin if it holds.
Sheet 04The market

€689M in theory. €2.1 to 3.5M in five years.

TAM · Mediterranean
€689M
SAM · Morocco
€68-70M
SOM · five years
€2.1-3.5M
TAM

49,225 potential units × €14,000. The hardware value if every addressable site bought a unit. It is a build-out figure, not demand.

SAM

The Moroccan share. A planning estimate: there is no site list behind it yet.

SOM

150 to 250 units, 0.3 to 0.5% of TAM. A target, not an order book.

The global wave and tidal market was about USD 646M in 2025, heading to about USD 1.42B by 2034 at 9.1% a year (Precedence Research). Analysts’ estimates vary widely, from about USD 0.6B to 2B for 2025.

Sheet 05Evidence

What exists today.

1st
Expleo Innovation JamTangier · first product iteration
3rd
SEALAB 2025Forum de la Mer, El Jadida
3rd
TDC 2025 Innovation ChallengeCRI Tangier

A €12,000 GreenUp Morocco award, secured and non-dilutive.

Research

PhD at FST Tangier on modelling and control of a hybrid marine renewable energy system. Supervisor: Prof. Mustafa Ouardouz, Université Abdelmalek Essaâdi.

Pilot site

A private coastal operator has approved prototype testing at its site. Maritime authorisations still need confirming.

Not yet provenMetered annual output at sea.
GreenUp Morocco programme photograph

What the pilots have to settle

RiskMitigation in the designWhat phase 1 funds
Storm loadsSubmerged rotor and a defined safe stateStructural testing and load validation
Biofouling and corrosionSealed housings and replaceable partsExposure tests and service records
PermittingSite-specific authorisation processSafety studies and permit dossiers
Output below modelMeter output against sea stateContinuous metering across 3 to 5 pilot sites

Mitigations are design intent, not proven performance. Lower output reduces the value of every unit. The raise funds the measurement.

Sheet 06The plan

€600,000 for 18 months.

Every euro is tied to one deliverable: a measured output record from the sea.

Engineering and validation€220,000

13 m prototype, sealing and structural tests

Pilot deployments€180,000

Manufacture, install and monitor at 3 to 5 sites

Authorisations and safety€140,000

Studies, dossiers and compliance work

Data and monitoring€60,000

Metering, telemetry and client reporting

Months 0 to 4

Design freeze and costed bill of materials.

Months 4 to 9

13 m prototype at the secured site. Metering begins after commissioning.

Months 9 to 15

Deployment at 3 to 5 pilot sites.

Months 15 to 18

First paid contracts. All milestones are targets.

First deliverable

A measured output record from the pilot site. A full year of sea data needs 12 months after commissioning, so it arrives after month 18.

Sheet 07The team

Engineers who ship hardware.

Yassir Aoulad Ben AliProject owner and CTO

Automotive engineer at VW Group (Expleo) and PhD researcher at FST Tangier.

Hicham AbiProject director

Delivery leadership at Expleo. Previously Faurecia and Altran.

Khalid KhouidiBusiness relations

Marelli, Faurecia and Altran. Manufacturing and process improvement.

Mohammad ElouakrimiIndustrialisation

Stellantis and Expleo. Quality and production planning.

Advisors and mentors

Prof. Mustafa Ouardouz · FST Tangier · PhD supervision

Karim Wanny · GreenUp Morocco · pitch structure and market analysis

Younes Taghi · CRI Tangier · early concept and TDC guidance

FST TangierUniversité Abdelmalek EssaâdiProgramme partners

Programme logos are context. They do not assert investment, certification or endorsement.

Sheet 08Contact

Request a briefing.

For investors, port authorities, cooperatives and public bodies. Tell us who you are and what you need.

This opens your email app with the message ready. We reply from contact@ta9amarine.ma.

Or write to
Concept illustration